1. Inspect and tighten all electrical connections
and terminals.
2. Remove, clean, and adjust main gas burners.
3. Remove, clean, and adjust ignition/pilot assembly.
4. Thoroughly brush and vacuum clean the heat-exchanger(s) and combustion
chambers.
5. Inspect heat-exchanger(s) & combustion chambers for cracks, rusting, or
problem areas.
6. Vacuum out blower compartment; return airdrop, and surrounding area.
(No duct cleaning)
7. Clean central filter return air grille in home.
8. Inspect the flue assembly and test flue gas drafting mechanism.
9. Test and inspect all furnace safety controls.
10. Test, record, and adjust gas pressure.
11. Replace or clean standard air filters.
12. Clean blower motor, drive mechanism and fan assembly.
13. Lubricate all fan motors and all moving parts.
14. Measure and adjust blower for correct airflow.
15. Adjust all dampers and set proper blower speed(s).
16. Clean, level, test, and calibrate thermostat.
17. Measure and record heating system output.
18. Inspect and test thermocouple output as well as pilot safety switch.
19. Measure and record electrical voltage, amperage, and component
resistance.
20. Inspect and test all system transformers, relays, contactors, and
controls, measure performance.
21. Repair minor air leaks in plenum and return airdrop.
22. Perform a complete and thorough, room-by-room, electronic carbon
monoxide check of the entire house.
23. Advise customer on other ways to reduce energy consumption, improve
safety and enhance comfort. |
1. Chemically clean and thoroughly wash condenser
coil(s).
2. Thoroughly clean standard air filter.
3. Wash and level condensing unit for proper motor and bearing wear.
4. Lubricate motor and fan bearings as well as other moving parts as
necessary.
5. Clean and inspect evaporator coil and drain pan when readily
accessible.
6. Clean and inspect condensate drain lines and fittings.
7. Clean, level, and calibrate thermostat.
8. Adjust and thoroughly clean blower motor and fan assembly as needed.
9. Inspect, tighten and test all electrical connections. This includes
disconnect switch.
10. Inspect all cooling system electrical wires, connectors, and
terminals.
11. Test system starting and running capacitors.
12. Test all controls, switches, relays, transformers, contactors, motors,
and fans.
13. Measure starting and running amperes, line voltage, and control
voltage.
14. Test system-starting capabilities.
15. Test system for proper airflow and air delivery.
16. Inspect and adjust all safety controls.
17. Monitor refrigerant (Freon) pressures and temperatures.
18. Test and record super-heat and sub-cooling. Compare with factory
specifications.
19. Adjust Freon metering control device per factory/manufactures
recommendations.
20. Test and measure air-conditioning system for proper production and
capacity.
21. Monitor fan motors and compressor operating temperatures.
22. Apply weather resistant protective coating to the outside unit.
(Condenser)
23. Complete and present full written report. |